6.2.2.4. Installation of the Ring Mount Base Unit
screw (G)
OIS FPC
OIS FPC
Screw (F)
Zoom Drive Pin
1. Install 1st Lens Frame Unit with Cam Barrel Unit to
Ring Mount Base Unit with adjusting the rotational phase
as shown in the figure while pulling out the FPC
via the Hole.
Aperture FPC
Insertion Hole
2. Tighten screw (G)
Aperture FPC
3. Attach Zoom Drive Pin and tighten screw (F)
Long Groove
Short Groove
OIS FPC
<Note>
- When installing, insert these FPC into the insertion hole
- Do not damage the FPC
by using the torque driver with specified torque.
- Screw(G) × 4
- Torque : 20±2Ncm
Fix 2 FPCs.
by using the torque driver with specified torque.
- Screw(F) × 1
- Torque : 14±1Ncm
Long Groove is upper side.
(Cross section)
Aperture FPC
Insertion Hole
7mm
4
SILVER
BLUE=Zoom Drive Pin
Orange=Screw (F)
Cam Barrel Unit