Samsung AM CNB C AA Series Technical Data Book page 38

Table of Contents

Advertisement

13. Installation
DVM Hydro unit HT installation
Considering the weight and vibration of the DVM Hydro unit HT, the strength of
the base ground must be strong enough to support the unit and prevent noise.
The base must be flat and level.
Adjust the level support keeping at least 10 mm (0.4 inch) from the bottom of
the level support to the bottom of the fixed bracket.
Place the DVM Hydro unit HT on the base and fix it with a bolt or threaded rod
(M10, 3/8"), nut and washer.
The recommended length of the bolt or threaded rod is over 20 mm (0.78 inch)
from the base.
Adjustable level
support
Fixed Bracket
10 mm
(0 .4 inch)
< A method of fixing the bracket >

Advertisement

Table of Contents
loading

Table of Contents