Weider POWERGUIDE X4.2 Owner's Manual page 23

Multi-station dual stack
Hide thumbs Also See for POWERGUIDE X4.2:
Table of Contents

Advertisement

27
(32). Bolt in place using 5/16" X 2"
HEX
HEAD
BOLTS
(59) to bolt
down through the Welded Bracket
and then through the Pivot Bracket.
Secure with 5/16" NYLON
LOCK
NUTS (51).
. 31
RIGHT
ARM PRESS
WELDED
PULLEY
BRACKET
loop it under and around PULLEY E
(45) on the LEFT ARM PRESS ARM
(32).
Set
the
CABLE
TRAP
BRACKET (47) over the Pulley and
Cable
and set at about the ten
o'clock position
and tighten
the
:
Po:
assembly.
Check to see that the
Pod
Welded
Pulley Bracket
is bolted
Е
behind the FRONT UPRIGHT (10)
Н
:
and
fit the
Cable
into
the
iof
d
pre-assembled 3 1/2" "V" PULLEY
i
H
(46).
Position the CABLE
TRAP
ооо.066
.
of the Pulley edge.
Tighten the
PULLEY TRAP BRACKET
POSITION
the Cable by bolting with a 5/46" x1
PULLEY С
1/4" HEX HEAD
BOLT (116) down
through the top of the Bracket of the
Pulley assembly.
Assemble a 1/2"
O.D.
X
5/16"
LONG
METAL:
BUSHING (130) onto the Bolt, then
through the loop of the Cable and a
5/16" FLAT WASHER (50). Secure
with
a 5/16"
NYLON
LOCK
NUT
rotate on the Bolt.
FRONT OF BENCH

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerguide x4s

Table of Contents