3 - DESCRIPTION

3.4 - Safety equipment

CARRIER high temperature heat pumps of series c2 are equipped 
with the following safety features:
■ Refrigerant circuit safety valves
■ High and low pressure sensors for electronic monitoring of the 
operating state
■ Mechanical pressure switches
■ Hot gas sensor/compressor outlet temperature monitoring
■ Differential pressure switch for monitoring the water/brine flow 
rate at the evaporator
■ Phase and field rotation monitoring
■ Thermal motor winding protection
■ Oil temperature limiter
■ Oil level limiter at the compressor 
■ Motor overload relay for pumps in external heat source systems 
(WQA) and heat sink systems (WNA) (optional)
■ Motor overload relay for compressor windings (only on versions 
without soft starter)

3.5 - Guarantee

All  CARRIER  heat  pumps  are  covered  by  a  guarantee  of  24 
months,  provided  the  installation  and  operating  conditions  are 
adhered to and the system datasheets have been completed. The 
system  design  and  layout  must  comply  with  the  applicable 
engineering standards. Appropriate flow rates in the heat source 
and  heat  sink  must  be  ensured.  The  water  quality  of  the  heat 
transfer  media  must  always  be  ensured.  In  the  case  of  heat 
sources  for  brine  (geothermal  collectors,  ditch  collectors  or 
geothermal probes), the system installer is responsible for sizing 
the  extraction  surface  or  capacity,  taking  account  of  local 
conditions.  No  liability  is  accepted  for  any  heat  pump  faults 
resulting from the heat source system (WQA), the heating system 
(heat sink system, WNA), incorrect settings of the control elements 
or force majeure (lightning strike, flooding, etc.). 
The heat pump must be commissioned by CARRIER customer 
service. Correct installation and function of the WNA, WQA and 
electrical  installation  must  be  ensured  by  the  system  installer. 
Otherwise any guarantee or warranty is invalid. 
BEFORE  INSTALLING  AND  COMMISSIONING  THE  HEAT 
PUMP, READ THESE OPERATING INSTRUCTIONS IN FULL.
Additional work necessary to refit incorrectly positioned or fitted 
devices  will  be  invoiced  in  the  case  of  work  carried  out  under 
guarantee.