Download Print this page

Weider 831.15393 User Manual page 10

Advertisement

12. Attach the Top Frame (6) between the Squat Upright
(4) and the Swivel Upright (5) with four 8/16" x 3 3/4"
Bolts (92), the two Short Frame Plates (52), and two
5116"Nylon Locknuts (86) as shown. Do not tighten
the Bolts and Locknuts yet.
Attach the four Weight Guides (42) to the Top Frame
(6) with two 3/8" x 6 112"Bolts (95) and two 318"
Nylon Locknuts(87).
13. Press two 2" x 3" Inner Caps (58) into the Top Frame
(6) and the ButterflyTop Frame (7).
Attach the Butterfly Top Frame (7) to the Top Frame
(6) with two 5/16" x 2 314"Bolts (85), two 5/16"
Washers (90), and two 5/16" Nylon Locknuts (86).
Do not tighten the Locknute yet.
Attach the ButterflyTop Frame (7) to the Butterfly
Upright (3) with two 5/16" x 3 3/4" Bolts (92), two
5/16" Washers (90), and two 5/16" Nylon Locknuts
(86).
Tighten all of the 5/16" Nylon Locknuts (86) and
3/8" Nylon Locknuts (87) used in steps 2-13.
14. Open the parts bag labeled "ARM ASSEMBLY."
Press three 1 112"x 2" Inner Caps (21) into the Leg
Lever (10). Attach the Eyebolt (116) to the Leg
Lever with a 318"Washer (91) and a 3/8" Nylon
Jamnut (113).
Lubricatea 3/8" x 2 1/2" Bolt (18) with grease. Turn
the Leg Lever (10) so that the welded tab is on the
indicated side, and attach the Leg Lever to the Seat
Upright (9) with the Bolt and a 318"Nylon Locknut
(87). Do not overtighten the Nylon Locknut; the
Leg Lever must be able to pivot easily.
15. Press a 2" x 2 1/2" Inner Cap (125) into the
Butterfly Frame (47). Attach the tethers on the two
"L"-pins w/Tether (60) to the ButterflyFrame with a
#8 x 3/4" Screw (98).
Lubricate a 3/8" x 3" Bolt (107) with grease. Attach
the Butterfly Frame (47) to the ButterflyTop Frame
(7) with the Bolt and a 3/8" Nylon Locknut (87). Do
not overtighten the Nylon Locknut; the Butterfly
Frame must be able to pivot easily.
12
r//
52
_L_
9_
_'_g2
13
92____9
o
86<
58
85
58
14
21
87
21
116
15
21
10

Advertisement

loading