Service Diagnosis; Ice Production - Hoshizaki KM-280MAF-E Service Manual

Modular crescent cuber
Hide thumbs Also See for KM-280MAF-E:
Table of Contents

Advertisement

IV. SERVICE DIAGNOSIS
1. NO ICE PRODUCTION
PROBLEM
[1] The icemaker
a) Power Supply
will not start
b) Fuse (Inside Fused
Disconnect, if any)
c) Control Switch
d) Bin Control
Thermostat
e) High Pressure
Control
f) Transformer
g) Wiring to
Controller Board
h) Thermistor
i) Hot Gas Solenoid
Valve
j) Water Supply Line
k) Water Solenoid
l) Controller Board
POSSIBLE CAUSE
1. "OFF" position.
2. Loose connections.
3. Bad contacts.
4. Voltage too high.
1. Blown out.
1. "OFF" position.
2. Bad contacts.
1. Tripped with bin filled
with ice.
2. Ambient temperature
too cool.
3. Set too warm.
4. Bulb out of position.
5. Bad contacts or leaks
bulb.
1. Bad contacts.
1. Thermal fuse blown out
or coil winding opened.
1. Loose connections or
open.
1. Leads short-circuit or
open and High Temperature
Safety operates.
1. Continues to open in freeze 1. Check for power off in
cycle and High Temperature
Safety operates.
1. Water supply off and
water supply cycle does
not finish.
2. Condenser water pressure
too low or off and Pressure
Control opens and closes
frequently to finally operate
High Temperature Safety.
1. Mesh filter or orifice gets
clogged and water supply
cycle does not finish.
2. Coil winding opened.
3. Wiring to Water Valve.
1. Defective
56
REMEDY
1. Move to "ON" position
2. Tighten
3. Check for continuity and
replace.
4. Check and get
recommended voltage.
1. Check for short circuit
and replace
1. Move to "ICE" position.
2. Check for continuity and
replace.
1. Remove ice.
2. Increase ambient
temperature.
3. See "II.2.[d]
CONTROLS AND
ADJUSTMENTS, 5) Bin
Control."
4. Place in position.
5. Check for continuity and
replace.
1. Check for continuity and
replace.
1. Replace.
1. Check for continuity and
replace.
1. See "II.2.[d] CONTROLS
AND ADJUSTMENTS,
1) Defrost Control."
freeze cycle and replace.
1. Check and get
recommended pressure.
2. Check and get
recommended pressure.
1. Clean.
2. Replace.
3. Check for loose
connection or open, and
replace.
1. See "II.2[e] CHECKING
CONTROLLER BOARD."

Advertisement

Table of Contents
loading

Table of Contents