Pipe, fittings, primer and solvent cement used to vent
(exhaust) this appliance must be certified to ULC S636 and
supplied by a single manufacturer as part of an approved
vent (exhaust) system. When bonding the vent system to
the furnace, use ULC S636 approved One-Step Transition
Cement to bond the pipe to the flue collar. In addition, the
first three feet of vent pipe from the furnace flue collar must
be accessible for inspection.
Table 4 lists the available exhaust termination kits. All vent
terminations are PVC.
Piping and Fittings Specifications
Schedule 40 PVC (Pipe)
Schedule 40 PVC (Fittings)
Schedule 40 CPVC (Pipe)
Schedule 40 CPVC (Fittings)
SDR-21 PVC or SDR-26 PVC (Pipe)
SDR-21 CPVC or SDR-26 CPVC (Pipe)
Schedule 40 ABS (Pipe)
Schedule 40 ABS (Fittings)
ABS-DWV (Drain Waste & Vent)
(Pipe & Fittings)
PVC-DWV (Drain Waste & Vent)
(Pipe & Fittings)
Primer & Solvent Cement
PVC & CPVC Primer
PVC Solvent Cement
CPVC Solvent Cement
ABS Solvent Cement
PVC/CPVC/ABS All Purpose Cement For
Fittings & Pipe of the same material
ABS to PVC or CPVC Transition Solvent
Cement
Canada Pipe & Fitting & Solvent Cement
PVC & CPVC Pipe and Fittings
PVC & CPVC Solvent Cement
ABS to PVC or CPVC Transition Cement
Polypropylene Venting System
PolyPro® by Duravent
InnoFlue® by Centrotherm
ECCO Polypropylene Vent
Page 14 of 52
D1785
D2466
F441
F438
D2241
F442
D1527
D2468
D2661
D2665
ASTM
Specification
F656
D2564
F493
D2235
D2564, D2235,
F493
D3138
Marking
ULCS636
ULC-S636
ULC-S636
ULC-S636
TM
Table 5.
Joint Cementing Procedure
All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
NOTE: A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation.
1.
Measure and cut vent pipe to desired length.
2.
Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
3.
Clean and dry surfaces to be joined.
4.
Test fit joint and mark depth of fitting on outside of pipe.
5.
Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of fitting
socket.
6.
Promptly apply solvent cement to end of pipe and
inside socket surface of fitting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
NOTE: Time is critical at this stage. Do Not allow
Primer to dry before applying cement.
7.
Immediately after applying last coat of cement to pipe,
and while both inside socket surface and end of pipe
are wet with cement, forcefully insert end of pipe into
socket until it bottoms out. Turn PVC pipe 1/4 turn
during assembly (but not after pipe is fully inserted) to
distribute cement evenly. Do not turn ABS or cellular
core pipe.
NOTE: Assembly should be completed within 20
seconds after last application of cement. Hammer
blows should not be used when inserting pipe.
8.
After assembly, wipe excess cement from pipe at end
of fitting socket. A properly made joint will show a bead
around its entire perimeter. Any gaps may indicate
an improper defective assembly due to insufficient
solvent.
9.
Handle joints carefully until completely set.
Issue 2327
DANGER
508391-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

97g2dfe

Table of Contents