Reservoir/Rear Bushing Disassembly - Follett Horizon Elite HCD1010A Operation And Service Manual

Ice machines (self-contained)
Table of Contents

Advertisement

Reservoir/rear bushing disassembly

1. Press CLEAN button to purge
evaporator. Turn power OFF
when LO WATER lights.
Note: In many applications,
removing the gearmotor,
main housing, and
auger will allow for
the ice machine to be
pulled out further for
better access to rear
components.
2. Slide ice machine forward to
gain access.
3. Use Fig. 33 as disassembly
guide.
Note: Use petrogel when
installing/reinstalling
o-rings.
Refrigeration system
1010 - Refrigerant pressure data
Air-cooled condensers (air)
Pressure (psig) discharge/suction
System Operating Pressures (Discharge/Suction) PSIG
Potable Water F/C
50/10
60/16
50/10
260/34 260/34
60/16
260/34 260/34
70/21
260/35 260/35
80/27
273/36 284/36
90/32
285/37 288/37
Note: The water control valve is factory set to maintain 260 ± 15 PSIG discharge pressure on R404A @ 70 F/21 C
water, and 245 PSIG ± 15psi discharge pressure on R449A @ 70 F/21 C water.
HCC1010A/W, HCD1010A/W, HCC1410A/W, HCD1410A/W
Fig. 33
60 F/16 C
190/32
70/21
80/27
90/32
260/34
260/34
260/34
260/34
260/34
260/34
260/35
260/35
260/35
285/36
285/36
285/36
290/37
290/37
290/37
70 F/21 C
80 F/27 C
225/34
258/36
psig
psig
psig
psig
psig
90 F/32 C
100 F/38 C
292/39
325/41
25

Advertisement

Table of Contents
loading

Table of Contents