Step 4: Install remaining horizontal panel mount angles (K) to the floor.
a. Connect pieces together using the tabs.
b. Make all outside faces flush.
c. Fasten to floor with customer supplied hardware using the holes closest to the outside face.
I
Step 5: Install the other vertical panel mount channel (I) upright on the right side of the opening.
a. Make tight to floor and plumb/level.
b. Make outside face flush with the horizontal panel mount angles (K) outside face.
c. Fasten to opening with customer supplied hardware.
6
Modular Open Array
Step 3: Install first horizontal panel mount angle (K) to the
floor of the opening. Push tab tight against the wall.
K K K K K K K K K
K
K
I
®