Step 11: After both vertical panel mount channels (I) are up and secure to the wall, install the first end panel (E) to
the far left side of the array.
a. Set end panel (E) into the layer channel (L) and tight to the vertical panel mount channel (I) and make
plumb/level along the array plane.
b. Insert (2) PN 416081 screws through the bottom holes of end panel (E) and layer channel (L).
c. Insert PN 416081 screws through the side, end panel (E) and vertical panel mount
channel (I), as shown in the image below.