7: Operation; Start Up Checklist - Panduit PDM Operation Manual

Automatic cable tie installation system
Table of Contents

Advertisement

© Panduit Corp. 2013
LEVEL 6 - Language Menu
Set language
Language
6. Press the "Language" button to select the language at the next menu in which all menus will be displayed.
Pressing this button will bring up the following display:
English
The menu can be displayed in the following languages: English, Deutsch (German), Française (French),
Italiana (Italian), Español (Spanish), Czech (Èeský), Danish (Danske), Swedish (Svenska), and Finish
(Suomen). The current language chosen is shown at the upper left of the display.
To select another language, press the "↑" button to scroll "up" thru the language choices, or press the "↓" button
to scroll "down" thru the language choices. When the preferred language is displayed at the upper left, press the
"Select" button to choose that language, and to return to the last menu level (Level 6). All menus will be
displayed in the selected language. If the incorrect language was selected, press the "Language" button to
return to Level 8A to select the correct language.
Press the "Escape" button to return directly to Level 1 or 1B (Operator Menus). See Step 1.
The "MENU" button is unavailable since Level 6 is the last Setup menu.
Press the "Exit" button to return to the last menu level (Level 5). See Step 5.
Remember!!
Once you "Escape" out of the Setup menus, you must repeat the sequence (Steps 3.a.
and 3.b.) to re-enter the higher menu levels (Level 3 thru Level 6).

7: OPERATION

Follow this operation procedure to correctly apply cable ties. To begin, follow the Start Up Checklist below to assure
safety and optimum system operation.
7A: Start Up Checklist
1. Is the PDM Dispenser connected to the air supply? (Refer to the System Connection section on Page 10.)
2. Is the air pressure set properly? 65 PSIG with a maximum 10 PSI drop is recommended. (Refer to the Air
Supply section on Page 8.)
3. Is the PDM Dispenser loaded properly? (Refer to the Loading Procedure section on Pages 11-13.)
4. Is the PHM Feeder Hose securely connected to the PAT1M or PAT1.5M Tool, and PDM Dispenser? (Refer to
the Loading Procedure section on Pages 11-13.)
5. Is the Level 1 or 1B Operator Menu displayed on the PDM Dispenser? The Level 1 or 1B Operator Menu must
be displayed on the dispenser for the tool to cycle cable ties. Refer to the Cable Tie Installation section (next) for
proper menu display.
OPERATION MANUAL
Escape
LEVEL 6A
Exit
Select
Page: 16 of 39
PAT1M, PAT1.5M, PDM
ENGLISH

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pat1.5mPat1m

Table of Contents