Raising The Mast - Generac Power Systems MLT3080KV Operating Manual

Light tower
Table of Contents

Advertisement

RAISING THE MAST

1. Set up and level the unit. Refer to
Up" on page
14.
WARNING
The unit must be leveled with the
outriggers extended before raising the
mast. The outriggers must remain
extended while the mast is up. Failure
to level the unit or extend the
outriggers will severely reduce
stability and could allow the unit to tip
and fall.
2. Check the mast cables for excessive wear or dam-
age. Make sure the cables are properly centered in
each pulley (A). Check the electrical cord for damage.
WARNING
Do not start the unit if insulation on the
electrical cord is cut or worn through.
Bare wires in contact with the mast or
frame may energize the unit and cause
electrocution. Repair or replace a
damaged cord.
3. Press and hold the winch control toggle switch (B)
upward to telescope the mast to the desired height.
Extend the mast slowly, making sure that the coiled
electrical cord is extending at the top sections of the
mast. If, for any reason, the winch cable begins to
develop slack or any of the mast sections get stuck,
STOP IMMEDIATELY and contact an authorized
service center.
CAUTION
Do not extend the mast beyond the
colored mark on top of the lower mast
section (C). A limit switch on the main mast
section will disconnect power to prevent
overextending the mast.
4. The mast can be rotated by loosening the mast rotation knob at the bottom of the mast (D). Turn the mast until
the lights face in the desired direction and then tighten the knob.
"Light Tower Set
WARNING
Never raise or lower the mast while the unit is operating.
A
C
D
DETAIL B
STOP
DETAIL C
B
00182
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mlt3060kvMlt3060mv

Table of Contents