Site Preparation - Follett Horizon Elite 1412 Installation Instructions Manual

Table of Contents

Advertisement

Prior to installation, carefully unpack and inspect the
contents of your condensing unit!
To ensure proper performance, ease of service and warranty coverage, it is critical that you follow
the requirements detailed in this manual. If you cannot meet these requirements or have questions,
call our technical service group at 877.612.5086 for installation support.
2.1
1.1
Condenser Unit Clearances
• Position condenser unit as shown.
Required clearances:
§ Mininum 48" (121.9 cm) front and back
§ Minimum 24" (61.0 cm) left and right
§ Minimum 36" (91.4 cm) above
REMOTE CONDENSING UNIT
min. 36.00"
(91.4 cm)
24.00"
(61.0 cm)
24.00"
(61.0 cm)
48.00"
(121.9 cm)

Site preparation

air in
48.00"
(121.9 cm)
1
3

Advertisement

Table of Contents
loading

Table of Contents