Table Of Contents - Roberts Gorden ENERGYTUBE AG Series Installation, Operation & Service Manual

Gas fired, low intensity unitary heater
Table of Contents

Advertisement

TABLE OF CONTENTS

SECTION 1: Heater Safety...................................................... 1
1.1 Manpower Requirements ............................................. 1
1.2 Safety Labels and Their Placement ............................. 1
1.3 California Proposition 65 .............................................. 1
SECTION 2: Installer Responsibility ..................................... 4
2.1 Wall Tag ....................................................................... 4
2.2 Corrosive Chemicals.................................................... 4
SECTION 3: Clearances to Combustibles............................. 5
3.1 Required Clearances to Combustibles......................... 5
4.1 Gas Codes................................................................. 10
4.2 Aircraft Hangars ......................................................... 10
4.3 Public Garages .......................................................... 10
4.4 Electrical .................................................................... 10
4.5 Venting....................................................................... 10
4.6 High Altitude .............................................................. 10
SECTION 5: Major Components .......................................... 11
5.1 Standard Parts List .................................................... 13
SECTION 6: Heater Installation............................................ 16
SECTION 7: Optional Heater Accessories .......................... 26
7.1 U-Tube Configuration.................................................. 26
7.2 Elbow Package Configuration..................................... 29
7.3 Reflector Side Extension ............................................ 31
7.4 Lower Clearance Shield Installation ........................... 32
SECTION 8: Venting.............................................................. 34
8.1 Venting....................................................................... 34
8.2 Unvented Operation................................................... 35
8.3 Horizontal Venting...................................................... 35
8.4 Vertical Venting .......................................................... 35
8.5 Unvented Operation Tube Termination ...................... 35
8.6 Length Requirements ................................................ 35
8.7 Vent Material Recommendations ............................... 35
8.9 Vertical Ventilation 4'' (10 cm) Pipe............................ 36
8.10 Common Side Wall Venting ..................................... 37
8.11 Common Vertical Venting ........................................ 38
8.12 Outside Combustion Air Supply ............................... 39
SECTION 9: Gas Piping ........................................................ 42
SECTION 10: Wiring.............................................................. 44
10.1 Line Voltage Thermostat Wiring ............................... 44
Burners..................................................................... 45
All rights reserved. No part of this work covered by the copyrights herein may be reproduced
or copied in any form or by any means - graphic, electronic, or mechanical, including
photocopying, recording, taping or information storage and retrieval systems - without the
written permission of Roberts-Gordon LLC.
© 2016
Roberts-Gordon LLC
Printed in U.S.A.
10.4 Internal Wiring.......................................................... 45
10.5 Ladder Diagram ....................................................... 46
10.6 Electrical Connection to the Burner ......................... 46
SECTION 11: Operation and Maintenance.......................... 47
11.1 Sequence of Operation ............................................ 47
11.2 To Shut Off Heater.................................................... 47
11.3 To Start Heater ......................................................... 47
11.5 Maintenance Checklist ............................................. 48
SECTION 12: Troubleshooting............................................. 50
12.1 Troubleshooting Flow Chart ..................................... 51
12.2 Manifold Gas Pressure Setting ................................ 53
SECTION 13: Replacement Parts ........................................ 54
SECTION 14: General Specifications .................................. 56
14.1 Material Specifications............................................. 56
14.2 Heater Specifications............................................... 56
14.3 Suspension Specifications....................................... 56
14.4 Controls Specifications ............................................ 56
®
®
AG Warranty ........................ 57

Advertisement

Table of Contents
loading

Table of Contents