Preparatory work
(EXC-F SIX DAYS, XCF-W)
–
Remove the engine guard. (
Main work
(XCF‑W)
–
Position the motorcycle upright.
–
Place an appropriate container under the water pump
cover.
–
Remove screw
–
Completely drain the coolant.
V01798-11
(All EU models)
–
Position the motorcycle upright.
–
Place an appropriate container under the water pump
cover.
–
Remove screw
–
Completely drain the coolant.
V01799-10
–
Mount and tighten screw
Guideline
Screw, water pump
cover
–
Pour coolant in up to level
Guideline
A
Distance
ator fins
H01698-10
Coolant
–
Mount radiator cap
–
Go for a short test ride.
–
Check the coolant level. (
Finishing work
(EXC-F SIX DAYS, XCF-W)
–
Install the engine guard. (
COOLING SYSTEM 16
p. 97)
1
. Take off radiator cap
1
. Take off radiator cap
1
with a new seal ring.
M6
10 Nm (7.4 lbf ft)
A
above the radiator fins.
10 mm (0.39 in)
above the radi-
1.2 l (1.3 qt.)
Coolant (
2
.
p. 132)
p. 98)
2
.
2
.
p. 164)
135