3. Interconnection and Settings

3.1. Interconnection

Make sure to connect the GP-39 to the SCX-21 – Data 1 port.
Notes:
When the SCX-21 is connected to the GP-
(1)
39, the original antenna GPA-017 or
GPA-C01 CANNOT be used.
(2) In the configuration of an SCX-21 with a GP-39, the GP-39 NMEA0183 output port is occupied
by the SCX-21. In order to output/input data from/to the SCX-21, utilize Data 2 and
Data 3 ports of SCX-21. (Data 2 is output only)
3.2. Setting – Operation Mode
Change the operation mode of the GP39 to make the GP-39 work as an SCX-21 display.
Option 1 – When turning the power on for the
first time...
When the SCX-21 is turned on for the first time,
the Installation menu will launch: Access
[Operation
Mode]
(Default: [GP-39]) After changing the mode,
the GP-39 will restart.
and
select
[SCX-21].