Arrow Storage Products LM10667 Owner's Manual & Assembly Manual page 28

Table of Contents

Advertisement

Step 12: Roof Framing
You will need for this page:
(QTY: 12)
1
Seal the gap between the Gables using the weather stripping tape as shown. Do
this at both ends of the building before installing Roof Beams.
2
Position the Roof Beams as shown below and install using two (2) bolts and nuts
per side. Install the Main (center) Beam fi rst.
Tape should wrap around gap between Gables.
Beam End Views
Angled side of Beams must face up.
67293
8474
Roof Beam
2
Assemblies from Step 3:
Main Roof Beam Assembly (1)
Weather Stripping Tape
Tape BOTH Gable joints before installing Roof Beams.
67293
28
Top View of Gables
67293
CUT
28AXa

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rmg106Rmg106z

Table of Contents