Platform Mesh To Mid Or Top Rail - JLG 1250AJP Operation & Safety Manual

Hide thumbs Also See for 1250AJP:
Table of Contents

Advertisement

Accessories
4. To remove material, loosen and remove tie-down straps, then carefully remove
material from racks.
Note: Reinstall tie-down straps across any remaining material before continuing ma-
chine operations.
6.8

PLATFORM MESH TO MID OR TOP RAIL

BM000015A
BM000016A
Figure 28. Platform Mesh to Mid Rail
Figure 29. Platform Mesh to Top Rail
The Platform Mesh to Mid Rail accessory consists of stainless steel mesh attached to the
platform mid rail.
The Platform Mesh to Top Rail accessory consists of lightweight, aluminum mesh
attached to the platform top rail.
106
31222384
1250AJP

Advertisement

Table of Contents
loading

Table of Contents