Sharp SF-2025 Service Manual page 94

Table of Contents

Advertisement

No. 2/3 mirror base unit installing position
This is to adjust parallelism of mirror base B and the drum surface
and the original surface.
1
Manually turn the mirror base drive pulley, and press the copy
lamp unit onto the optical section projection. If the clearance be-
tween mirror base B and the rear frame is 2 mm in the front frame
side and in the rear frame side, parallelism of mirror base B is
proper and no further adjustment is required. If not, loosen the
pulley fixing screw as shown below, and move the pulley to adjust
parallelism.
A
6 – 21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-20Sf-21Sf-dm11

Table of Contents