INSTALLATION

WARNING!
Do not start the machine until it has been in position for
24 hours. If for some reason the tumble dryer needs to
be laid down for transport or service, it must be laid on
its left side viewed from the front.
INSTALLATION
See the separate installation instructions included in the
set of documents.
NOTE!
Do not install the machine in a room where there is a
risk of frost occurring. At temperatures around freezing
point the machine may not be able to operate properly.
The room in which the appliance is installed should be
adequately ventilated, with temperature between 15°C
and 25°C.

ELECTRICAL INSTALLATION

Connect the machine by plugging it into an earthed
wall socket. The electrical wall socket must be placed
outside of the installation area to be easily accessible.

CONNECTION ON DELIVERY

• 230V, 1-Phase, 10A
• 50Hz
• Use a type A residual-current device.
NOTE!
Do not connect the machine to the mains electricity
supply by an extension lead.
20

COIN OPERATION

The machine is prepared for coin operation. Such
installation must be carried out by a qualifi ed professional.
The installation requires a connection cable to power the
coin meter. This connection cable can be ordered using
the factory art. no. 92 090 95.
The coin meter shall be able to short circuit two signal
lines for periods of up to 10 minutes. This is to give the
user time to load the machine, choose a programme and
start the programme after putting the coins in.
"Insert coin" appears on the display when the machine is
started with the main power switch.