Power Wiring; Enclosure Power Supply; Power Up And Initial Checkout; Connect The Backup Batteries - Honeywell SEC-H-602 Manual

Security controller
Table of Contents

Advertisement

15VDC FROM
WEBS-AX
SECURITY
ENCLOSURE
SEC-
H-R2R/U
1
NOT SHOWN IS 15VDC POWER AND BATTERY BACKUP CONNECTIONS, WHICH USE THE OTHER (TOP) 3 POSITIONS ON THE
6-POSITION CONNECTOR PLUGS.
2
TERMINALS ON THE 6-POSITION CONNECTOR PLUGS USED FOR RS-485 BETWEEN ASSEMBLIES.
Fig. 14. RS-485 cabling between Security Controller and expansion modules not mounted in-line.

POWER WIRING

It is recommended that the Security Controller be
powered by the approved NPB-PWR-UN-H/U, regulated
15Vdc power source. For related information, see
"Estimating Power and Battery Requirements," page 6.
CAUTION
Door strike power, as well as power for other
loads switched by the security controller and/
or its expansion modules, should always be
provided from a different source.
Do not apply power to the security controller
until all other mounting and wiring is
completed. See "Power Up and Initial
Checkout," page 23.

Enclosure Power Supply

The integral power supply (NPB+PWR+UN+H/U) in a
WEBs-AX Security Enclosure (SEC-ENC-H-1/U or SEC-
ENC-H-2/U) provides 30W of regulated 15Vdc power to
an Security Controller and its connected expansion
modules, and is required for UL 294. Input voltage is
120Vac to 240Vac, single phase. You mount the Security
Controller on the top DIN rail in the enclosure, where it
connects into this power supply (see Fig. 3 on page 10). If
an SEC-ENC-H-2/U enclosure, a provided 6-wire harness
lets you connect expansion modules on the second
(lower) DIN rail.
SECURITY
CONTROLLER
SEC-
SEC-H-RIO/U
H-R2R/U
SEC-H-RIO/U
SEC-H-602 AND SEC-H-616 SECURITY CONTROLLER
SHIELDED, TWISTED
PAIR CABLING
CONNECT RS-485
SHIELD WIRE TO
GROUND AT ONE
END ONLY.
SEC-
H-R2R/U
POWER UP AND INITIAL
CHECKOUT
Ensure power wiring to the Security Controller is ready—
see "Power Wiring," page 23. Refer to Fig. 4 on page 11
for the locations of the NiMH battery connector, status
LEDs, and 4-position connector for 12V sealed lead acid
backup battery(ies).
Following all mounting and wiring, perform the
following:

1. Connect the Backup Batteries.

2. Apply Power.
3. Check the Status LEDs.
Connect the Backup Batteries
For background details, see "About the Backup Batteries,"
page 24. Make the following battery connections:
• Connect the NiMH Battery
• Connect the Backup Battery
Connect the NiMH Battery
With the cover removed from the Security Controller,
locate the red and black wires coming from the NiMH
battery pack, with 2-position connector plug. Insert the
plug into the battery connector on the bottom board (near
option slot 2 area), as shown in the figure below.
23
1
+
S
2
M35028
31-00012—03

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sec-h-616

Table of Contents