INSTALLATION
32
6
Connect the external ground (if required by
local codes) to the green ground screw.
7
Tighten all screws securely.
8
Reinstall the terminal block access cover.
a
White Wire from Dryer harness
Hot Leads of Power Cord (Black and Red)
b
Neutral Wire (White)
c
d
External Ground Wire (if required by local
codes)
Ground Screw
e
Three-Wire Direct Wire
• A 3-wire connection is NOT
permitted on new construction
after January 1, 1996.
• A UL-listed strain relief is required.
• Use UL-listed 3-wire, #10 AWG minimum
copper conductor cable. Allow at least 1.5 m
length to allow for removal and installation of
appliance.
1
Remove 8.9 cm of the outer covering from the
wire. Strip 2.5 cm
insulation from each wire.
a
Bend the ends of the three wires into a hook
shape.
2
Remove the terminal block access cover on the
upper back of the appliance.
3
Install UL-listed strain relief into the power
cord through-hole.
4
Thread the 3-wire, #10 AWG minimum copper
conductor power cable prepared in step 1
through the strain relief.
a
Terminal block
UL-listed strain relief
b
UL-listed 3-wire power cord
c
5
Attach the two hot leads (black and red) of the
power cord to the outer terminal block screws.
6
Attach the neutral (white) wire to the center
terminal block screw.
WARNING
• This appliance is supplied with the neutral wire
grounded. If a 3-wire cord is to be used and is
allowed, make sure the white neutral grounding
wire is connected to the green ground screw.