Rheem Solar Hiline 52D Series Owner's Manual And Installation Instructions page 55

Open circuit
Table of Contents

Advertisement

INSTALLATION CHECK LIST
Prior to handover, complete the installation check list:
1.
System is installed as per the installation instructions ............................................................................ [
2.
Water is connected, turned on and solar storage tank is filled ................................................................ [
3.
All mechanical fixings are secured .......................................................................................................... [
4.
Collector rail has a rise of 12-15 mm per collector on the hot outlet side of the solar collectors
if installed directly onto the roof ............................................................................................................... [
5.
Collector rail is either horizontal or higher on the hot outlet side of the solar collectors
if part of a frame ...................................................................................................................................... [
6.
Protective plastic film removed from tank (if fitted) ................................................................................. [
7.
Covers removed from collectors .............................................................................................................. [
8.
Pipe, conduit penetrations through the roof have been sealed correctly ................................................ [
9.
Roof tiles put back into position ............................................................................................................... [
10. Roof flashing watertight ........................................................................................................................... [
11. System checked for water leaks and pipe connections are correctly tightened ...................................... [
12. Cold and hot water piping checked for water leaks ................................................................................. [
13. Drain pipes free of any obstruction .......................................................................................................... [
14. All pipe work clipped where necessary ................................................................................................... [
15. Electrical power to the booster is switched on (if required) ..................................................................... [
16. Operation of booster checked ................................................................................................................. [
17. Air bled from taps .................................................................................................................................... [
55
COMMISSIONING
]
]
]
]
]
]
]
]
]
]
]
]
]
]
]
]
]