Pre-Start Inspection - JLG R4045 Operation & Safety Manual

Hide thumbs Also See for R4045:
Table of Contents

Advertisement

User Responsibilities, Machine Preparation, and Inspection
Type

Pre-Start Inspection

Pre-Delivery Inspec-
tion (See Note)
Frequent Inspection
(See Note)
Annual Machine In-
spection (See Note)
Preventive
Maintenance
Note: Inspection forms are available from JLG. Use the Service & Maintenance Manual to perform inspections.
JLG Industries, Inc. recognizes a factory trained service technician as a person who
has successfully completed the JLG Service Training School for the specified JLG
product model.
2.3
PRE-START INSPECTION
The Pre-Start Inspection should include each of the following:
1. Cleanliness – Check all surfaces for leakage (oil, fuel, or battery fluid) or foreign
objects. Report any leakage to the proper maintenance personnel.
28
Table 3. Inspection and Maintenance Table
Frequency
Primary
Responsibility
Before using each
User or Operator
day; or whenever
there is an Operator
change
Owner, Dealer, or
Before each sale,
lease, or rental
User
delivery
In service for 3
Owner, Dealer, or
months or 150
User
hours, whichever
comes first
or
Out of service for a
period of more
than 3 months
or
Purchased used
Annually, no later
Owner, Dealer, or
than 13 months
User
from the date of
prior inspection
At intervals as
Owner, Dealer, or
specified in the
User
Service & Mainte-
nance Manual
NOTICE
31221538
Service
Reference
Qualification
User or Operator
Operation & Safety
Manual
Service & Mainte-
Qualified JLG
nance Manual and
Mechanic
applicable JLG in-
spection form
Qualified JLG
Service & Mainte-
nance Manual and
Mechanic
applicable JLG in-
spection form
Service & Mainte-
Factory Trained
nance Manual and
Service Technician
(Recommended)
applicable JLG in-
spection form
Service & Mainte-
Qualified JLG
Mechanic
nance Manual
R4045

Advertisement

Table of Contents
loading

Table of Contents