Simulated Resistive Device Testing And Replacement - Bradford White URG2PV75H N Series Service Manual

Ultra low nox residential & light duty commercial gas power vent 75 gallon
Table of Contents

Advertisement

UPV75 Series
Simulative Resistance Device Testing
Step 1. Position power switch on gas
control to the "OFF" position.
Step 2. Disconnect simulated resistive
device harness from gas control.
Step 3. Using a multi-meter set to the
ohms setting, check resistance of
simulative resistance device.
Resistance must be between 3,000
ohms and 48,000 ohms. If outside
of this range replace the simulated
resistive device.
DO NOT use a standard multi-meter probe for this
test. Doing so will damage the connector. Use
special pin type electronic probes or small
diameter wire pins inserted into connector.
28
28
CAUTION
UPV75 SERVICE PROCEDURE VII
Simulative Resistance Device
Testing and Replacement

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ulg2pv75h76 n series

Table of Contents