Burner Operation Inspection, Cleaning & Replacement - Bradford White URG2PV75H N Series Service Manual

Ultra low nox residential & light duty commercial gas power vent 75 gallon
Table of Contents

Advertisement

UPV75 Series
Burner Inspection
At periodic intervals (every 6 months) a visual inspection should be made of the pilot and main
burner for proper operation and to assure no debris is accumulating.
Pilot flame should be stable, some causes for an unstable pilot flame are:
a) Water heater vent is less than the allowable vent length.
b) Gas pressure is out of specification.
c) Pilot flame not fully engulfing spark/flame sensor.
Main burner should light smoothly from pilot and burn with a
blue flame with a minimum of yellow tips. Main burner must
be free from any debris accumulation that may affect burner
operation.
Burner Cleaning
Step 1.
Position the gas control power
switch to the "OFF" position and
unplug the heater from the wall
outlet.
Step 2.
Turn off gas supply to the water
heater.
Step 3.
Remove outer jacket door.
Step 4.
Disconnect pilot tube (
wrench) and feedline (¾"
wrench) from gas control.
Step 5.
Disconnect igniter/flame sensor
wire from gas control.
Step 6.
Remove the (4) ¼" hex drive
screws holding the right side
inner door in place.
Step 7.
Remove the (4) ¼" hex drive
screws holding the left side
burner door in place.
Step 8.
Remove burner assembly
from combustion chamber.
UPV75 SERVICE PROCEDURE I
Burner Operation Inspection,
Cleaning and Replacement
"
7
/
16
15
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ulg2pv75h76 n series

Table of Contents