Bradford White URG2PV75H N Series Service Manual page 20

Ultra low nox residential & light duty commercial gas power vent 75 gallon
Table of Contents

Advertisement

UPV75 Series
Pressure Switch Replacement
Step 1.
Position gas control power
switch to "OFF" position.
Step 2.
Remove the three screws (Phillip's
screw driver) from control access cover
on blower assembly and remove cover
(see photo 3).
Step 3.
Remove pressure switch from blower housing by removing the two T10 screws
(see photo 4a). If it does not have 2 screws, carefully remove it from the housing
(see photo 4b).
Step 4.
Disconnect tubing from pressure switch (see photo 5).
Step 5.
Disconnect yellow wires from pressure switch (see photo 6).
Step 6.
Reconnect yellow wires from step 5 to new pressure switch.
Step 7.
Reconnect tubing to new pressure switch.
Step 8.
Carefully position pressure switch into blower housing (see photo 4b).
Step 9.
Position gas control power switch to "ON" position and verify proper heater
operation.
Step 10. Replace control access cover from step 2.
20
20
UPV75 SERVICE PROCEDURE III
Pressure Switch Testing and Replacement
115 volt potential exposure. Use
caution to avoid personal injury.
'WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ulg2pv75h76 n series

Table of Contents