Pilot Testing, Cleaning & Replacement - Bradford White ECO-DEFENDER EURG2DV40S N Series Service Manual

Flammable vapor ignition resistant water heaters
Table of Contents

Advertisement

UDV Series
Remove Burner to Gain Access to the Pilot
Step 1.
Position the gas control knob in
the "OFF" position.
Step 2.
Turn off the gas supply to the
water heater.
Step 3.
Remove the outer jacket door
and inner doors per service
procedure VI on page 16.
Step 4.
Disconnect the igniter wire from
the gas control. Disconnect the
red and white pilot wires from the
gas control.
Step 5.
Disconnect the pilot tube (7/16"
wrench) from the gas control.
Step 6.
Disconnect the main feedline
(3/4" wrench) from gas control.
Step 7.
Remove the burner assembly
from the combustion chamber.
UDV SERVICE PROCEDURE II
Pilot Testing, Cleaning & Replacement
11
11

Advertisement

Table of Contents
loading

Table of Contents