Burner Operation Inspection, Cleaning And Replacement - Bradford White U2TW75T*RN Service Manual

Gas water heaters u ttw 75 series
Table of Contents

Advertisement

Main Burner Inspection, Cleaning and Replacement
At periodic intervals (not more than 6 months) a visual inspection should be made of the main burner for proper operation
and to insure no debris is accumulating.
Main burner should light smoothly from pilot and burn with a blue flame with a minimum of yellow tips. After
approximately 5 minutes of operation the burner screen will become radiant and the flame will soften and turn orange. If
the burner screen does not become radiant after 5 minutes of operation it must be cleaned (see burner cleaning procedure
below).
Main burner must be free from any debris accumulation that may affect burner operation (see burner cleaning procedure
below).
Under no circumstances shall flammable materials be used or stored in the vicinity of the water heater. If
flammable vapors are present, a fire or explosion may result causing property damage, personal injury or
death.
Inner door and burner components may be HOT when performing this operation. Take
Burner Cleaning
Step 1.
Remove burner and inner door assembly per SERVICE PROCEDURE I, steps 3 through 4.
Step 2.
Remove manifold cover from burner inner door by removing (2) ¼" hex drive screws and then sliding
manifold cover to the right. Use a stiff brush, compressed air and/or shop vacuum to remove any debris
build up from the manifold mount.
Step 3.
Remove manifold brackets from burner by removing (4) ¼" hex drive screws.
necessary precaution to prevent personal injury.
¼" Hex Drive Manifold
Cover Screws
Manifold Cover
U TTW SERVICE PROCEDURE II
Burner Operation Inspection,
Cleaning and Replacement
DANGER
WARNING
¼" Hex Drive Manifold
R
Bracket Screws
Page 17
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Utw475s76r*n

Table of Contents