8. WIRING EXAMPLE AND HOW TO SET THE REMOTE CONTROLLER

8-1 HOW TO CONNECT WIRINGS
• Connect the piping only after finishing the refrigerant piping work.
• Make sure all power supply is shut down to the unit first.
• As shown in the Fig. 16, loosen the two screws in the control box lid, remove it, and do the wiring work.
• Once all wiring is done, attach the control box lid and secure it with the screws.
If you are using "8-4 DEFAULT SETTINGS," however, finish that and then attach the control box lid and
secure it with the screws.
8-2 THE GAS PIPING THERMISTOR
• Connect to (X5A) on A1P.
• Bundle the gas piping thermistor lead wire and the branch wiring (transmission) using the included
clamping material.
• Tension is not added to the gas pipe thermistor lead wire coming out of the unit.
• Power supply wiring
Connect the wiring to R (L) and S (N) on the power supply terminal block (X1M). Also, connect the ground
wire to the ground terminal. Take the wiring and the ground wire into the unit through the wiring pass-
through hole, and firmly secure them together using the included clamp (1).
• Indoor unit inter-unit wiring
Connect the wires to 1, 2, and 3 on the power supply terminal block (X1M). Take the wires into the unit
through the wiring pass-through hole, and firmly secure them using the included clamp (1).
• Transmission wiring
Connect the wires to F1 and F2 on the transmission terminal block (X2M). Take them into the unit through
the wiring pass-through hole, and firmly secure the gas piping thermister lead wire and the transmission
wiring using the included clamp (1).
Clamp (1)
(accessory)
Clasp
Indoor unit inter-unit wiring
Clamp (1)
(accessory)
Clasp
Ground wire
Power supply wiring
[ CAUTIONS ]
• Do not under any circumstances connect the power supply wiring to the transmission terminal block (F1,
F2), as this may cause damage to the entire system.
12
• Ground wire
X1M
X2M
F1 F2
1
2
3
R
(
L
)
S
(
N
)
Clasp
Clamp (1)
(accessory)
Transmission
Gas piping thermistor lead wire
wiring
The gas piping thermistor lead wire should
be passed through the clamp (1).
Ground terminal
Gas piping
thermistor lead wiring
Low
voltage
Transmission wiring
Ground wire
High
Power supply wiring
voltage
Indoor unit
inter-unit wiring
Control box lid
Fig. 16
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bevq71maveBevq100mveBevq100maveBevq125mveBevq125mave

Table of Contents