Wiring Diagram - Toshiba RAS-M07G3DV-E Service Manual

Air-conditioner multi-split type
Hide thumbs Also See for RAS-M07G3DV-E:
Table of Contents

Advertisement

Color Indication
RED:RED
BLU:BLUE
WHI:WHITE
BLK:BLACK
YEL:YELLOW
GRN:GREEN
BRW:BROWN
BLK
WHI
RED
CN22
BLK
1
2
3
TB01
EARTH
CONNECTION
BLK
CABLE
BLK
TB02
A B
EARTH
1ø220-240V~, 50Hz
220V~, 60Hz
Symbol
Parts name
CN**
Connector
A B
F01
Fuse
FM
Fan Motor
Indoor
TA
temp.sensor
Wired remote
controller
Terminal
TB01,02
Block
(Option)
TC,TCJ Temp.sensor
Drain pump
DM
Motor
FS
Float Switch
L
Reactor

5. WIRING DIAGRAM

CN210
1
F01
(WHI)
T6.3A
250V~
1
3
5
CN67
(BLK)
+
+
1
CN41
(BLU)
2
-
CN01
1
3
(BLU)
L
1. Broken line indicate the wiring at site.
Long dashed short dashed line indicate the
accessories.
2.
indicates the terminal block.
indicates the connection terminal.
indicates the connector on the control
P.C.board.
3.
indicates the protection ground.
4.
indicates the control P.C.board.
DM
MS
FM
M
1 2
2
3
4
5
6
7
CN504
(WHI)
Main P.C.Board
MCC-1643
DC20V
Power
DC15V
supply
DC12V
circuit
DC 7V
CN61(YEL)
1 2 3 4 5 6
T10 (HA)
Quick check for diagnosing faults
Check Items
Check to see if the OPERATION indicater goes on & off
1
when the main switch or circuit breakers turned on,or power
OPERATION
cord is plugged in the wall outlet.
indicater
Check for the voltage between 1 and 2 is 220 to 240VAC.
2
Terminal
Check for the voltage between 2 and 3 is 15 to 60VDC.
block
Fuse
Check Varistor if the fuse is open.
3
6.3A
Check for the voltage between 7 and 6 terminal of CN214.
DC5V
4
– 25 –
FS
1
3
SW501
CN34
(External static
(RED)
pressure setup)
ON
CN104
1
(YEL)
2
1
2
1
CN102
(RED)
2
CN71
(CHK)
1
CN101
(BLK)
2
(DISP)
CN72
CN214(WHI)
1 2
3 5
4 6
7 8 9
9
Diagnosis result
TA
TCJ
TC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents