Download Print this page

Samsung SM-E625F Service Manual page 7

Advertisement

7. Level 2 Repair
7-4. Disassembly
1) Put the device in the AOD jig.
1
Set the AOD condition
- SOC 68%↓: Upper 70℃/ Lower 60 ℃ 5min
- SOC 68%↑: Upper 60℃/ Lower 60 ℃ 5min
2) Disassemble the Back-Cover using the AOD.
※ Caution
Be care of scratch.
Remove all 15 points of Rear Screws
3
- Torque Value : 1.15kgf ± 7%
※ Caution
Be care of Rear damage.
Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
2
Remove Rear Cover.
※ Caution
Be care of scratch.
4
Remove 1 PBA screw.
- Torque Value : 1.1kgf ± 7%
※ Caution
Be careful not to damage the PBA.

Advertisement

loading

This manual is also suitable for:

Sm-m625f