7. Level 2 Repair
Screw insertion 1 Point.
5
- Torque Value : 1.1kgf ± 7%
※ Caution
Be care of PBA damage.
7
changed to the new one Backcover Outside
tape.
※ Caution
Be care of damage each part.
Confidential and proprietary-the contents in this service guide subject to change without prior notice
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
6
Assemble Rear and screw insertion 15 point.
- Torque Value : 1.15 ±7%
※ Caution
Be care of Rear damage.
8
Press Back Glass.
- Pressing force : 1 N
- Pressing time : 1 minute
SIM Tray must be seperated before pressing
the backglass or the OCTA
※ SIM Tray must be separated before
pressing the backglass or the LCD.
※ Caution
Be care of scratch Rear cover.