Installation; Preparation For Mounting - Siemens SINUMERIK 840D sl Manual

Operator panel front
Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

Installation

3.1

Preparation for mounting

Electric shock in the event of an individual error when grounding is insufficient
If the panel is installed with inadequate grounding in an environment with hazardous voltages,
this may cause an electric shock in the event of an individual error. This can result in death,
serious injury and material damage.
Adequately ground the conductive parts of the panel in accordance with the nationally
applicable regulations. When dimensioning the protective conductor connection, note the fuse
ratings of the electrical circuits with hazardous voltages, which would have an effect in
possible individual error scenarios.
Parasitic voltage
If the device is installed with inadequate insulation in an environment with higher/more
hazardous voltages, parasitic voltages may occur. This can result in death, serious injury and
material damage.
Insulate the cables appropriately for the highest voltage coming into consideration.
The safety of a system with an integrated operator panel front is the responsibility of the system
installer.
The installation is performed in accordance with the installer's instructions.
Observe all the relevant information from this manual regarding installation.
Dimensions
Table 3-1
Thanks to the tension jacks on the OP 012, drill-holes or screw holes are not needed.
Operator panel front: OP 012
Manual, 05/2019, A5E36371591B AB
WARNING
WARNING
Dimensions of the mounting opening
Width (mm)
450
3
Height (mm)
290
19