Gobo Installation - Elation PROTEUS HYBRID WMG User Manual

Hide thumbs Also See for PROTEUS HYBRID WMG:
Table of Contents

Advertisement

GOBO INSTALLATION

WARNING! GOBO REPLACEMENT SHOULD ONLY BE DONE BE A TRAINED TECHNICIAN.
1. Turn OFF power and allow approximately 60 minutes for the fixture to cool down.
2. Place the head in an upright vertical position and engage both the PAN and TILT locks for
added stability while replacing the gobo.
3. Remove (12x) 3mm hex-head screws (6x per panel) to remove both center panels.
TILT Lock
PAN Lock
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proteus hybridPrh021

Table of Contents