Roberts Gorden GordonRay BH-60 Installation, Operation & Service Manual page 16

Economical unitary infrared heater
Table of Contents

Advertisement

BH-S
I
, O
ERIES
NSTALLATION
PERATION AND
FIGURE 14: Major Component Descriptions - High Efficiency Reflector
Burner with Tube Gasket
Must be installed with the
flame observation window
facing down.
Burner Tube
Supplied in 10' (3 m) lengths.
Burner tube is always the first
tube after the burner.
Tube and Reflector Hanger
with Clamp Package-EF
Position this hanger no more
than 4" (10 cm) away from the
burner.
Tube and Reflector Hanger-EF
Suspend system from these
hangers.
Reflector Support Strap &
Wire Form-EF
Flex Gas Line with
Shut Off Cock
12 of 63
S
M
ERVICE
ANUAL
Reflector (Aluminum)
Alternate overlap as shown on
overview and on Page 19,
Figure 17. Minimum overlap is
6'' (16 cm).
Tube
Hot rolled or heat treated
aluminized tube supplied in
10' (3 m) lengths.
Coupling Assembly with Lock
Reflector End Cap-EF
Punch out center section to
accommodate tube.
Vent Adapter
Turbulator
Install turbulator as specified in the
"Turbulator Installation" chart. See
Page 21, Step 6.4. Turbulator is
not required on the BH-125/150/
175/200.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents