Installation - Kohler RIALTO PRESSURE LITE K-3404 Installation Instructions Manual

Vitreous china siphon jet toilet
Hide thumbs Also See for RIALTO PRESSURE LITE K-3404:
Table of Contents

Advertisement

Install new 1/4" or 5/16" diameter T-bolts.

INSTALLATION

INSTALL TOILET GASKET
Carefully set the new toilet upside down on padding.
Firmly install the gasket onto the toilet outlet. If using a
gasket with an integral plastic sleeve, position the gasket
with sleeve facing away from the toilet.
If a rag or other plug is in the closet flange, remove the rag
from the closet flange before setting the toilet.
ALIGN AND SET TOILET
Carefully align and lower the toilet over the closet flange
and T-bolts.
CAUTION: Risk of external leakage. Do not lift or
rock the toilet after placement – a new toilet gasket
must be installed if you break the watertight seal.
Apply full body weight to toilet rim to set seal.
SECURE TOILET
Install the bolt cap bases, washers, and nuts onto the
exposed T-bolts.
CAUTION: Risk of personal injury or product
damage. Overtightening may cause breakage or
chipping of the vitreous china.
Handtighten the nuts, then tighten them an additional
1/2-turn with a wrench. If the T-bolts extend more than
1/4" above the top of the nut, cut off the excess with a
hacksaw, and file the cut edges. Wipe away any residue.
Install the bolt caps.
EA
113363-2-
(9532)
T-Bolts
Toilet Outlet
Bolt Cap
Nut
Washer
Bolt Cap Base
4
Closet Flange
Fig. #5
Gasket
Fig. #6
Fig. #7
Fig. #8
Kohler Co., Kohler, WI

Advertisement

Table of Contents
loading

Table of Contents