Materials Required; Tools Required; Site Preparation - Kohler RIALTO PRESSURE LITE K-3404 Installation Instructions Manual

Vitreous china siphon jet toilet
Hide thumbs Also See for RIALTO PRESSURE LITE K-3404:
Table of Contents

Advertisement

MATERIALS REQUIRED

S
Supply stop (3/8" recommended)
S
Closet flange
S
Toilet gasket (wax seal)
S
Toilet T-bolts 1/2" or 5/16" diameter (2 required)
S
Toilet supply tubing

SITE PREPARATION

REMOVE EXISTING TOILET
NOTICE: Carefully inspect the new fixture for any
sign of damage before removing the existing toilet.
If any damage to the vitreous china or Pressure Lite
system components is discovered, stop the installation
and call your dealer for assistance.
Inspect the complete toilet to ensure that the:
S
Components and outlet manifold are attached
securely.
S
Trip lever and piston actuation arm move freely.
S
Reservoir is securely mounted.
S
Vitreous china is not damaged.
Turn off the water supply.
Flush the toilet, and sponge out the remaining water from
the tank and bowl.
Disconnect the supply stop, and remove the existing tank
and bowl.
Remove the old gasket from the floor and closet flange
with a putty knife.
Remove the old T-bolts (the T-shaped bolts in the closet
flange) and discard.
NOTICE: If the new toilet is not installed immediately,
temporarily stuff a rag in the closet flange.
EA
113363-2-
(9532)

TOOLS REQUIRED

S
10" adjustable wrench
S
12" pipe wrench
S
Tubing cutter
S
Hacksaw
S
Level
S
Putty knife
S
Metal file
S
Tape measure
S
Screwdriver
NOTE: Site preparation may require additional tools.
2
Closet Flange
Fig. #1
Kohler Co., Kohler, WI

Advertisement

Table of Contents
loading

Table of Contents