Omron FZ2-30 10 Series Instruction Manual page 11

Vision sensor
Table of Contents

Advertisement

Mounting
LCD integrated type
• Panel mounting
1
Make a mount hole on the panel.
Panel thickness range: 1.6 to 4.8 mm
Panel material: Metal (iron, aluminum
or stainless)
2
Insert the LCD integrated controller
into the hole, from the front panel.
Use the bracket (supplied with the
3
product) to secure the controller
and the panel.
Tightening torque: 0.5 to 0.6 Nm
• Mounting the controller to the optional
desktop stand.
The controller can be placed on
a desk by attaching the optional
desktop stand (FZ-DS) to the
rear of the controller.
* For details, refer to the instruction
manual of the desktop stand.
Box type
• Side mounting
4-M4 Depth 6
+ 1
297
0
Top face
Bottom face
• Mounting the controller to the optional
VESA attachment unit.
VESA-compatible mounting of
the controller is possible by
attaching the optional VESA
attachment unit (FZ-VESA) to
the rear of the controller.
* For details, refer to the instruction
manual of the VESA attachment
• Bottom mounting
(17)
80 ± 0.25
* When mounting the controller on its bottom, it must be fixed
without removing the feet to reserve ventilation path.
(Unit: mm)
* No burr allowed
4-M4 Depth 6
(26)
100 ± 0.25
4-
20
(
)
39
10

Advertisement

Table of Contents
loading

Table of Contents