Commissioning; Overview: Commissioning; Precautions When Commissioning - Daikin RXTM30R2V1B Installer's Reference Manual

Hide thumbs Also See for RXTM30R2V1B:
Table of Contents

Advertisement

12 Commissioning

In this chapter

12.1 Overview: Commissioning

12.2 Precautions when commissioning

RXTM-R_RXTP-R_ARXTP-R_RXTA-B
R32 split series
4P518023-11H – 2021.03
NOTICE
General commissioning checklist. Next to the commissioning instructions in this
chapter, a general commissioning checklist is also available on the Daikin Business
Portal (authentication required).
The general commissioning checklist is complementary to the instructions in this
chapter and can be used as a guideline and reporting template during the
commissioning and hand-over to the user.
12.1
Overview: Commissioning ......................................................................................................................................................
12.2
Precautions when commissioning..........................................................................................................................................
12.3
Checklist before commissioning.............................................................................................................................................
12.4
Checklist during commissioning .............................................................................................................................................
12.5
To perform a test run .............................................................................................................................................................
12.6
Starting up the outdoor unit ..................................................................................................................................................
This chapter describes what you have to do and know to commission the system
after it is installed.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run for the system.
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT only the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
12
Commissioning
|
Installer reference guide
53
53
53
54
54
54
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents