7.3.4 To perform vacuum drying

Installer reference guide
40
2 Check for leaks by applying the bubble test solution to all connections.
3 Discharge all nitrogen gas.
DANGER: RISK OF EXPLOSION
Do NOT start the unit if it is vacuumed.
Connect the vacuum pump and manifold as follows:
a
c
b
d
e
f
f
g
a Low pressure gauge
b Gauge manifold
c High pressure gauge
d Low-pressure valve (Lo)
e High-pressure valve (Hi)
f Charging hoses
g Vacuum pump
h Valve caps
i Service port
j Gas stop valve
k Liquid stop valve
1 Vacuum the system until the pressure on the manifold indicates −0.1  MPa
(−1 bar).
2 Leave as is for 4-5 minutes and check the pressure:
If the pressure...
Does not change
Increases
3 Vacuum the system for at least 2  hours to a manifold pressure of −0.1  MPa
(−1 bar).
4 After turning the pump OFF, check the pressure for at least 1 hour.
5 If you do NOT reach the target vacuum or CANNOT maintain the vacuum for
1 hour, do the following:
▪ Check for leaks again.
▪ Perform vacuum drying again.

NOTICE

Make sure to open the stop valves after installing the refrigerant piping and
performing vacuum drying. Running the system with the stop valves closed may
break the compressor.
h
k
i
j
h
There is no moisture in the system.
This procedure is finished.
There is moisture in the system. Go
to the next step.
Then...
RXTM-R_RXTP-R_ARXTP-R_RXTA-B
R32 split series
4P518023-11H – 2021.03