Checking The Fluid Levels; Checking The Tire Pressure; Installing The Ce Kit - Toro 31902 Operator's Manual

All-wheel drive traction unit
Hide thumbs Also See for 31902:
Table of Contents

Advertisement

Figure 17
1. Flange-locknut (3/8 inch)
2. Driveshaft yoke
7.
Assemble a socket-head capscrew (3/8 x 2-1/4
inches) through a washer (3/8 inch) and the hole
in the driveshaft yoke from the opposite direction
(Figure
17), and secure the capscrew with a
flange-locknut (3/8 inch).
8.
Incrementally torque the locknuts to 61 N∙m (45
ft-lb) in an alternating pattern.
12

Checking the Fluid Levels

No Parts Required
Procedure
Before you start the engine for the first time, perform
the following fluid-level checks:
Check the engine-oil level; refer to
Engine-Oil Level (page
3. Washer (3/8 inch)
4. Socket-head capscrew
(3/8 x 2-1/4 inches)
Checking the
49).
Check the coolant level; refer to
Cooling System and Coolant Level (page
Check the hydraulic-fluid level; refer to
the Hydraulic-Fluid Level (page
13

Checking the Tire Pressure

No Parts Required
Procedure
Check the tire pressure; refer to
Pressure (page
Important:
Maintain pressure in all tires to
ensure a good quality-of-cut and proper machine
performance. Do not underinflate the tires.
14
g340626

Installing the CE Kit

Parts needed for this procedure:
CE Kit (ordered separately; refer to your authorized
1
Toro distributor)
Procedure
If you operate the machine in a country that complies
to CE standards, install the CE Kit; refer to the kit
Installation Instructions.
19
Checking the
65).
Checking the Tire Air
29).
58).
Checking

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 330031903

Table of Contents