Download Print this page

Toro Z Master 100 Series Installation Instructions Manual page 8

Hydraulic tank relocation kit

Advertisement

5. Install the tank stand in the upright position as shown in
figure 19, using one bolt (5/16 x 1 inch), one bolt
(5/16 x 3/4 inch), and two flange nuts (5/16 inch).
1
3
2
Figure 19
1. Tank stand, upright
position
2. Bolt, 5/16 x 1 inch
6. Position the hydraulic tank assembly on the tank stand,
lining up the existing holes in the tank to the tank stand
posts (Fig. 20).
1
2
Figure 20
1. Tank assembly
2. Tank stand post
7. Install the tank to the tank stand using two bolts
(1/4 x 1 inch) and two washers (1/4 inch) as shown in
figure 20.
4
5
m–7146
3. Bolt, 5/16 x 3/4 inch
4. Flange nut, 5/16 inch
5. Drilled hole
3
4
m–7161
3. Bolt, 1/4 x 1 inch
4. Washer, 1/4 inch
Rerouting the Hydraulic Pump lines
The hydraulic lines that connect the pump to the tank need
to be rerouted to reach the new tank position.
1. Loosen the swivel nuts of the threaded elbow
connections at both the left and right pumps and
disconnect the hydraulic lines (Fig. 21).
4
2
Figure 21
1. Hydraulic pump line
2. T-connection, old location
3. T-connection, new
location
Important
Do not disconnect the hydraulic lines at the
T–connection.
8
1
3
6
5
m–7155
4. Hydraulic tank
5. Right hydraulic pump
6. Left hydraulic pump

Advertisement

loading

This manual is also suitable for:

107-3080