CAME VLR01DX Installation Manual page 30

Shutter operator
Hide thumbs Also See for VLR01DX:
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 24
Fastening the operator
If the bay width is less than the dimensions of the operator base/bases, cut off any excess parts ❸. In such case, the
emergency batteries (item VLR05) may not be mounted.
Installation of transmission arms and sliding guides
Fit the operator using suitable screws and dowels.
For the two swing-leaved configuration, install the
MASTER operator ❹on the right and the SLAVE operator ❺
on the left.
Lubricate the motor shaft thread before fixing the
transmission arm.
Insert the arm (see also detail
handwheel on the motor shaft.
Leave the handwheel loose to facilitate the subsequent
insertion of the arm runner into the sliding rail.
need to be preassembled with a
loosened screws, for subsequent
) and the release
The VLR08 and VLR09 arms
adjustment.
Always use all three of the
supplied screws.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vlr01sxVlr02

Table of Contents