Cisco N540X-6Z18G-SYS-A Manual page 16

Hide thumbs Also See for N540X-6Z18G-SYS-A:
Table of Contents

Advertisement

Install the AC Power Cables
e. Place the grounding lug against the grounding pad so that there is solid metal-to-metal contact, and
f. Ensure that the lug and cable do not interfere with other equipment.
g. Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your
Install the AC Power Cables
To install the AC power cables in the power supply slots:
1. Plug the power supply cord in to the power supply module.
2. Wrap the tie around the power supply cord.
3. Ensure that the power supply cord is secured to the power supply module.
4. Tighten the tie around the power supply cord as shown.
Note
Activate an AC Power Supply Module
Perform the following procedure to activate an AC power supply:
1. Plug the power cord into the power supply.
Install the Device
16
insert the two #10-32 pan head Phillips screws with washers through the holes in the grounding lug
and into the grounding pad.
site to ensure adequate earth ground.
These images are for only representation purposes. Certain variants of Cisco NCS 540 routers don't
include a tie for the power supply cord.
Install the Device

Advertisement

Table of Contents
loading

Table of Contents