box (see Figure 10 ). Select VT100 or Auto detect from the Emulation drop-down list,
and click OK to return to the HyperTerminal window.
Figure 10
Set the emulation type
Starting up the LSQM1WCMB0
Checks before power-on
Before starting up the access controller module, verify that:
The power cables and ground cable are correctly connected.
The power outlet voltage meets the voltage requirement of the switch.
The console cable is correctly connected, the console terminal or PC is running,
and the terminal parameters are properly set.
21