DOOR ADJUSTMENT
After leveling and joining the merchandisers, adjust and level doors
according to manufacturer's instructions shipped with each product.
Factory settings may be lost due to vibration during shipment.
INSTALLING SPLASHGUARD BRACKETS
1. Attach splashguard retainer and splashguard retainer support to
splashguard support bracket using two screws per bracket.
2. Install splashguard support brackets underneath case. The leveling
brackets have a maximum extension of one (1) inch (25 mm) for
uneven floors.
Do not place shims under splashguard brackets.
NOTE
Install splashguard support brackets before piping case.
HUSSMANN CORPORATION • U.S. & CANADA 1-800-922-1919 • BRIDGETON, MO 63044-2483 • MEXICO 1-800-890-2900 • WWW.HUSSMANN.COM • PN 3053328_H
CASE JOINING
Sectional construction means that two or more merchandisers may
be joined in line yielding one long continuous display requiring only
one pair of ends. Joining kits and instructions are shipped with each
merchandiser.
To join like fixtures, a joining kit is required. To join unlike fixtures, or
like fixtures operating at different temperatures, a 2 inch (51 mm)
partition kit is required. To join same temperature merchandisers on
different defrost cycles, a plexiglass partition kit is required.
All joints must be air-tight to prevent formation of ice or condensation.
Refer to the instructions on the next page.
1-3