York HP Series Service Manual page 62

Hide thumbs Also See for HP Series:
Table of Contents

Advertisement

Hang the panel to the hooks on the mainbody.
Tighten the screws under the panel hooks till
the panel closely stick on the ceiling to avoid
condensate water.
Hang the air-in grill to the panel, then connect
the lead terminator of the swing motor and that
of
the
control
terminators on the body respectively.
Note: The panel shall be installed after the
wiring connected.
Ceiling-floor unit installation
13.2.3
13.2.3.1 Service space for indoor unit
13.2.3.2 Bolt pitch
① Ceiling installation
Capacity (Btu/h)
18K / 24K
② Wall-mounted installation
13.2.3.3 Install the pendant bolt
① Ceiling installation
59
box
with
corresponding
D
E
mm
983
220
inch
38.70
8.66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents