Kohler K-20629T-BW Installation Instructions Manual page 17

Vitreous china wall-hung p-trap toilet
Table of Contents

Advertisement

3. Tighten the bolt, screw cap and nut on the frame with a hex-
head wrench and fixate the Z-connecting plate.
3. 用六角匙将内六角螺栓用螺母及螺丝套固定在铁架上后,安
装 Z 连接板。
4. Fixate the adjustable brackets to the base plate with two
M8 coach/tek screws (not supplied) as shown. Then place
the nog (not supplied) on the back of the frame horizontally,
ensuring enough space and firmness.
4. 如图用 2 颗 M8 方头自攻螺丝(产品未提供)将水箱可调支
腿固定。然后将支撑架(产品未提供)水平放在铁架背面,
确保足够的安装空间和牢固。
5. Mark the two end positions of nog on the vertical studs as
shown. Cut off the redundant parts and then fixate the nog
to the studs.
5. 如图标记支撑架在木框架的左右位置,切掉左右多余的部分
后,将支撑架固定在木框架上。
6. Fixate the tank to the nog with two M8 coach/tek screws (not
supplied).
6. 如图用 2 颗 M8 方头自攻螺丝(产品未提供)将水箱固定在
支撑架上。
Note: 1. The timber and nog should be strong enough to
support the tank and toilet.
2. Following the steps: 1B. Discharge pipe installation
method before fixating the tank.
3. Ensure that the tank remains level and plumb.
注: 1. 木框架及支撑架应该有足够的强度支撑水箱及马桶。
2. 水箱固定前排污管安装步骤 1B:排污管安装方法。
3. 水箱保持水平和竖直方向。
Three. Installation of side overflow pipe (K-25440H-PNE)
三 . 侧边溢流管安装 (K-25440H-PNE)
Connect with overflow pipe on the side when installing.
施工时侧边接溢流管。
1402749-K2-A
Nog
支撑架
-10-
Spirit Level
水平尺
Z-connecting Plate
Z 连接板
Nut
螺母
Screw Cap
螺丝套
Bolt
内六角螺栓
M8 Coach/Tek Screws
(Not Supplied)
M8 方头自攻螺丝
(产品未提供)
Nog
支撑架
M8 Coach/Tek Screws
(Not Supplied)
M8 方头自攻螺丝
(产品未提供)
Overflow Pipe
接溢流管
Base Plate
基座
Fixing Hole
安装孔
Stud
木框架

Advertisement

Table of Contents
loading

Table of Contents