Starting the UPS

Starting the UPS for the first time requires the following procedures:
Checking the Battery Recharge Date label on the UPS shipping carton
Connecting the UPS to utility power via the input power cord
Connecting devices to the UPS
Powering up the UPS
Monitoring the automatic self-test to verify that the installation was
successful

Checking the Battery Recharge Date Label

Check the battery recharge date specified on the Battery Recharge Date label.
This label is affixed to the UPS shipping carton.
IMPORTANT: Do not use the UPS if the battery recharge date has expired. If the date on
the Battery Recharge Date label has passed without the batteries being recharged,
contact an Authorized Compaq Service Representative.
Figure 2-4. The Battery Recharge Date label
THIS PRODUCT CONTAINS
A NONSPILLABLE BATTERY
Next Recharge Date:
14-DEC-04
Please refer to Maintenance Section
of Owner's Manual enclosed inside
Installation 2-7